Here is the short answer: most cities in Collin County require a permit for a new fence, including McKinney, Frisco, Plano, and Allen. Like-for-like repairs often do not need one. And your city permit is only half the paperwork: if you live in an HOA community, you need architectural approval too.
A reputable fence contractor handles the permit as part of the project. But it pays to understand the rules yourself, because the requirements that trip up homeowners are rarely about the fence itself. They are about height, placement, easements, and the HOA. For budgeting the project itself, see our wood fence cost breakdown.
Do you need a permit? A city-by-city overview
Each city in Collin County runs its own permitting process, usually through a development services or building inspections department. The broad pattern is consistent:
- McKinney: a fence permit is required for most new fence installations.
- Frisco: new fences require a permit under the city's own rules.
- Plano: fence installations require a permit.
- Allen: new fences require a permit.
Details change over time, so confirm current requirements with the city before you build. If you are in Frisco, Plano, or Allen, the same principle applies: check the city's current fence rules, not a neighbor's memory of them.
The rules that trip up homeowners
Height limits
Many North Texas cities cap residential fences around 8 feet in rear and side yards and 4 feet or less in front yards, with extra restrictions on corner lots where fences cannot block driver sight lines. Measure twice: an 8-foot fence that creeps to 8-foot-6 with a cap and trim can technically exceed the limit.
Placement and property lines
Your fence must be on your property. That sounds obvious, but without a survey, being a few inches over is common, and it becomes your problem when a neighbor sells or builds. A current survey is cheap insurance on a multi-thousand-dollar project.
Easements
Utility and drainage easements often run along rear and side property lines, exactly where fences go. A fence built in an easement can be torn out by the utility without compensation. Check your plat for easements before finalizing the fence line.
Call 811 before you dig
Texas law requires calling 811 (Texas811) before digging so underground utility lines get marked. It is free, it is the law, and any contractor who skips it is one to avoid.
Repairs vs. new builds
Replacing a few pickets or rebuilding a single section in the same footprint usually does not trigger a permit. Tearing out and replacing the whole fence generally does, even if the new fence matches the old one. When in doubt, a quick call to the city's permit office settles it.
HOA approval is a separate gate
A city permit does not override your HOA. Most master-planned communities around McKinney require architectural review board approval before any fence work, with rules on height, materials, stain colors, and placement. Submit early: review often takes 2 to 4 weeks. Building with a city permit but no HOA approval can still earn you a violation letter and a rebuild order.
Do your homework before you apply
Most permit delays come from missing information, not from the fence itself. Before you or your contractor files, pull your plat or survey to confirm property lines and easements, read your HOA design guidelines for material and height rules, and decide on fence placement relative to sidewalks and alleys. Having the linear footage, height, material, and a simple site sketch ready turns the application into a single visit instead of a back-and-forth.
What happens if you skip the permit
Unpermitted fences get flagged during resale inspections, neighbor disputes, or routine code enforcement. Consequences range from stop-work orders and fines to being ordered to modify or remove the fence. The permit fee is modest next to the cost of the project; skipping it is a bad bet.
Permits, HOA submittals, surveys, and 811 locates are part of every project we build. Call for a free estimate, and we will keep your fence compliant from day one.